59480 BOILER COMMISSIONING KIT
Part #FER59480
MFG #BCK

Manufacturer Name : Fernox
- Boiler Commissioning Kit
- Item Commissioning Kit
- Used On Item Central Heating Boiler System
- Kit Content (1) Fernox Protector F1 17.6 Oz, (1) Fernox Cleaner F3 17.6 Oz,(4) Fernox pH Test Strips, (2) Fernox 60 Second Protector Check Strips, Instruction Leaflet
- Good Practice Dictates that Hydronic Central Heating Systems Should be Thoroughly Cleaned and Flushed Before Installing a New Boiler, After Which a Chemical Inhibitor Should be Added to Ensure the System is Protected from Corrosion, Scale and Sludge Build-Up; These Procedures Should also be Employed when Major Work is Carried Out on a System; A Clean, Protected System Helps Ensure that the Heat Generated by the Boiler is Transmitted Efficiently Into the House Over the Long Term; Maintain the Design Specification and Energy Efficiency; Restore Energy Efficiency; Inhibit the Formation of Scale and Sludge; Minimize Corrosion of System Metals; The Fernox Boiler Commissioning Kit is Supplied as with Full Instructions and is Non-Hazardous Reagents
- stylecontent